Energy efficiency rebates in North Carolina.
Every federal, state, and utility incentive for heat pumps, insulation, air sealing, and weatherization in North Carolina — cross-referenced and kept current.
Tell us about your project. We'll match you with local pros and every rebate you qualify for.
NC DEQ State Energy Office (Energy Saver NC, operator APTIM)
- Type
- State Agency
- Website
- www.energysavernc.org
- IRA allocation
- ~$208M total (approx — not confirmed at source)
Active rebate programs
6 programs currently accepting applications in North Carolina.
| Program | Amount | Eligibility | Status |
|---|---|---|---|
| Energy Saver NC — HEAR (federal) | Up to $14,000/dwelling | Household income ≤150% AMI (≤80% AMI covers 100% of cost, 80-150% AMI covers 50%). Per-measure caps: heat pump $8,000, HPWH $1,750, panel $4,000, wiring $2,500, insulation/air sealing/ventilation $1,600, electric stove/range $840, HP dryer $840. Live in all 100 counties (online + paper). Cannot be combined with HOMES for the same technology upgrade. | Active |
| Energy Saver NC — HOMES (federal) | Up to $16,000/dwelling | Whole-home retrofit with min 20% modeled energy savings; rebate scales with savings + income (roughly $2,000-$16,000). Cannot be combined with HEAR for the same technology upgrade. | Active |
| Duke Energy Home Energy Improvement | Heat pump $500 / strip-heat-to-HP $600-$1,000 / HPWH $500-$800 / windows up to $800 | Duke Energy Carolinas/Progress customers. Structure effective May 7, 2025. Free Home Energy Check within prior 24 months required for ALL Duke rebates; claim within 12 months of install. May combine with the federal rebates. | Active |
| Duke Energy Attic Insulation | $0.25-$0.31/sq ft, up to $600-$800 | Duke customers; tier by starting R-value (from R-19 or less up to $600, R-11 or less up to $700, R-2 or less up to $800), all to min R-38. HEC prerequisite applies. | Active |
| Duke Energy Duct Test & Repair | Up to $400 repair + up to $50 toward test | Duke customers; up to $400 toward duct repairs per unit plus up to $50 toward the $100 duct test. HEC prerequisite applies. | Active |
| Weatherization Assistance | Up to $8,000 | Income-qualified households | Active |
Run the numbers for North Carolina.
Free, no account needed. Every figure is cited, so you have a benchmark before a North Carolina contractor quotes you one.
IRA implementation status
How North Carolina is implementing the Inflation Reduction Act home energy rebates.
Metro areas in North Carolina
Local utility programs and municipal incentives by metro area.
Duke Energy territory
Duke Energy Progress territory
Rebates are step one
Once you know what North Carolina pays, here's the rest of the path: what order to do the work in, and what belongs on a fair quote.
What order to do it in
Envelope first, equipment second — how to sequence a retrofit to your budget and your rebates' deadlines.
How to read a quote
What belongs on a heat pump or insulation quote, and the red flags that mean keep shopping.
What attic insulation costs
Per-square-foot prices by material, and why this is the work rebate programs subsidize hardest.
Claim rebates after install
The document kit, the application walkthrough, and the mistakes that get claims rejected.
Rebates cover part of it. Here's the rest.
What North Carolina pays is the first rung. These cover the money questions underneath it: the 2026 federal rules, the state and utility loan programs worth checking before a bank, and the borrowing routes that come after.
How to pay for it
The whole money picture in order of cost: rebates first, then low-interest loans, then borrowing.
State energy loans
The state and utility loan programs we have verified at the administrator, with rates and conditions.
The 2026 rebate rules
What DOE Program Notices 26-1 and 26-2 changed about HEAR and HOMES, and which states are live.
Latest North Carolina energy news
Recent North Carolina rebate, policy, and efficiency coverage from our monitored sources.
Duke Energy wants to build a new gas plant. Regulators said not so fast.
North Carolina regulators just turned down Duke Energy's request to build a new gas-fired power plant in Richmond County, a rare rejection for a utility whose big plans usually get approved. The 255-megawatt plant, expected to cost $584 million, was meant to help supply power for data centers, the computer warehouses that run cloud services and AI and use huge amounts of electricity. The state's Utilities Commission said the projected demand from data centers was too uncertain to justify the cost right now, and that Duke hadn't shown the plant was the cheapest way to keep the lights on compared with options like battery storage, efficiency upgrades, or grid improvements. The ruling ties into a wider push across the country to keep data center costs off household electric bills. Governors in several states, along with a White House pledge signed by Duke and more than 200 other utilities, have promised that residential customers won't be stuck paying for power built to serve data centers. Commissioners cited that pledge directly in rejecting Duke's application, saying the company needs to show how the new plant fits with that promise. This doesn't shut the door for good. Duke can refile, and commissioners suggested it wait until the state finishes reviewing the company's broader long-term energy plan later this year. For homeowners, the takeaway is less about your own house and more about your utility bill: fights like this one are part of a growing effort to stop data center growth from quietly raising what regular customers pay for electricity.
Duke Energy to let low-income assistance program expire, advocates show
Duke Energy plans to let its Customer Assistance Program expire in December, when its three-year pilot ends. The program gives a monthly bill credit to Duke's lowest-income customers in North Carolina and has also made some participants eligible for weatherization upgrades, home improvements like insulation and air sealing that cut energy use and lower bills. Advocacy groups including the Southern Environmental Law Center say letting it lapse would hit as many as 46,000 low-income Duke Energy Carolinas customers and 41,000 Duke Energy Progress customers, raising their bills by about $42 a month this winter, on top of any separate rate increases Duke gets approved. The expiration is part of a larger rate case before the North Carolina Utilities Commission, where Duke is also asking for a 9.8 percent return on equity, the profit rate it earns for shareholders. Advocacy groups argue that rate is too high and are pushing for 9.1 percent instead, which they say would save customers roughly $140 million overall. Duke has offered $20 million in shareholder funds as a replacement measure, but advocates say that is far smaller in scale and reach than the existing ratepayer-funded program. If you live in North Carolina and get electricity from Duke Energy Carolinas or Duke Energy Progress, this case could affect both your rates and whether low-income bill assistance and weatherization help remain available after this year. The utilities commission has not yet ruled.
Two years after Hurricane Helene, survivors are taking lessons for the future
Two years after Hurricane Helene knocked out power, water, and communications across western North Carolina, communities there are turning emergency improvisation into lasting infrastructure. Asheville has set aside $2 million, with a possible $10 million over time, to support "resilience hubs" — existing community spaces like libraries and fire departments equipped to help neighbors during outages and disasters. One concrete step: solar-powered microgrids. The first, installed at a food pantry and laundromat in Marshall, uses batteries storing about 68 kilowatt-hours, enough to keep freezers, washers, and lights running for at least a day without sunlight or a grid connection. It's the first of 26 planned microgrids for community centers, food banks, and fire departments, funded by a $5 million state grant. For homeowners, this points to a broader trend worth watching: pairing solar panels with battery storage so your home or neighborhood can keep essentials running during an outage. Other lessons center on preparedness that doesn't require special equipment. Two-way radios using GMRS (general mobile radio service, a $35 license with no test required) let neighbors communicate when cell networks fail — license numbers jumped 130 percent after the storm. Tool libraries are teaching people chainsaw safety and lending out saws, generators, and other gear. And advocates are pushing to include people with disabilities in emergency planning, since they're far more likely to be displaced or go without food after a disaster. Together, these efforts suggest that resilience often comes less from a single building and more from relationships, skills, and backup power sources built before trouble hits.
Ready to see what you qualify for in North Carolina?
Tell us about your project and we'll match you with up to 3 licensed local contractors. Every quote itemizes the North Carolina incentives you qualify for. Free, no obligation.
North Carolina: up to $16,000 back right now
Get quotes